2017-12-04 <Rolling Chassis State of the Union>

Date

Attendees

Agenda

Minutes

ItemWhoNotes
Phase 1 (Wednesday 6)
  • Done
  • Matt
  • Done
  • Nobody
  • Snake Pit (Done)
  • Coilover plate
  • Steering tab
  • Seat Belt Tab (Next Term)

Phase 2

(Wednesday 6)

  • Shalin
  • Matt
  • Matt
  • Matt
  • Coilover Tabs Rear
  • Gussets
  • Hinge Pins
  • Battery Box Rail

Phase 3

(Monday 11)

  • Matt
  • Matt
  • Matt
  • Rear Clevises
  • Door Latch + Striker
  • Front Suspension Rework

Doors

(Friday)

  • Adam
  • Matt
  • Adam
  • Outside Handle (Wednesday)
  • Mounting Bracket
  • Door Assembly Drawing

Suspension

(Wednesday 13th)

  • Adam
  • Adam
  • Shalin
  • Control Arm Welding
  • Jig
  • New Inserts
Other Shit
  • Adam
  • Devon
  • Robi
  • Adam
  • Adam
  • Matt
  • Hub Rework
  • 4x Coilover Spring Adapter
  • Rack and Pinion Mount
  • Steering Coupler Pin 
  • Cut DD to Length
  • Snake Pit Rework
Orders
  • Shalin
  • Devon
  • Devon
  • Adam
  • Tak
  • Adam
  • Tak
  • Adam
  • Adam
  • Devon
  • Adam
  • E3(Suspension) 
  • Ament(Blocks Doors + Steel)
  • AVS(Blocking Hinge Pins)
  • MS(Blocking Steering)
  • Demtool
  • Baumeier(Blocking Clevises)
  • Spaenaur
  • Igus
  • Mcmaster
  • KW Anodization
  • Home Depot