Rev 10.5

This is an iteration of tube removal optimization. The back bar and top 30 case failed, so this could only be pursued if those collision cases are resolved.

 

 

Folder Path:

D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims

File Name:

October 11_Rev10.5

This project file was created using Rev 10.4 as the base project.


Updates from Rev 10.4:

  • Removed one pair of rear angled spiderweb tubes and the associated gussets.


 

Front Bar - PASS

 

 

Back Bar - PASS

 

 

Side 30 Wall - PASS

 

 

Side 60 Wall - PASS

 

 

A-Pillar - PASS

 

 

B-Pillar - PASS

 

 

C-Pillar - PASS

 

 

Front 30 Wall - PASS

 

 

Front 60 Wall - PASS

 

 

Top 60 - PASS

 

 

Top 30 - FAIL

 

 

Top 30 - PASS

 

 

 

Top - PASS

 

 

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.