Rev 10.1

First iteration of tube removal.

 

 

Folder Path:

D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims

File Name:

October 10_Rev10.1

This project file was created using Rev 10.0 as the base project.

 


Updates from Rev 10.0:

  • The 3 roof tubes positioned in front of the B-pillar were removed.


Front Bar - PASS

 

Back Bar - PASS

 

Side 30 Wall - PASS

 

 

Side 60 Wall - PASS

 

 

A Pillar - PASS

 

 

B Pillar - PASS

 

 

C Pillar - PASS

 

 

Front 30 Wall - PASS

 

 

Front 60 Wall - PASS

 

 

Top 60 Wall - PASS

 

 

Top - PASS

 

 

Top 30 Wall - PASS

 

 

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.