Rev 10.1
First iteration of tube removal.
Folder Path:
D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims
File Name:
October 10_Rev10.1
This project file was created using Rev 10.0 as the base project.
Updates from Rev 10.0:
The 3 roof tubes positioned in front of the B-pillar were removed.
Front Bar - PASS
Back Bar - PASS
Side 30 Wall - PASS
Side 60 Wall - PASS
A Pillar - PASS
B Pillar - PASS
C Pillar - PASS
Front 30 Wall - PASS
Front 60 Wall - PASS
Top 60 Wall - PASS
Top - PASS
Top 30 Wall - PASS
Combined Loading (Roll-Over) - Incomplete
It is the case with the pucks.
It needs to be setup using previous examples.
Advisor: Jason He
It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.