Rev 10.2

An iteration of tube removal optimization. This iteration is not an option, as the front 30 collision case did not pass. That was the only collision case that was simulated to save time.

 

Folder Path:

D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims

File Name:

October 10_Rev10.2

This project file was created using Rev 10.1 as the base project.


Updates from Rev 10.1:

  • The 4 pairs of vertical and horizontal spiderweb tubes that connected the floor tubes to the catamaran tubes were removed. Gussets were left in place.


Front 30 Wall - FAIL

 

 

 

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.