2024-11-23 Leads Meeting
Electrical
Boards will be arriving by next week hopefully
Meeting on Sunday 3pm to discuss future HW plans for W2025 and beyond
Shifting focus to MS15.5 electrical harnessing : Expect syncs/elec mech integration to be ongoing
PD board position changing, Telemetry added
Strategy
Refactor has completed database connection, route models and resistance calculations but waiting on ASC for weather API access
Firmware
Added faster scheduling for tasks. Our fastest speed for sending/handling data is now 100Hz
New members have submitted PRs for more peripherals (memory protection unit. Watchdogs)
New members have started looking into HIL. We are still looking into the best DAQ that can support all our needs
Mechanical
Dynamics
Rear-Hub: Members working on Spindle FEA, looking to start Hub FEA this week
Steering: On pause until FSU nodal/force calc updates
New task: optimize linkage weight (<1kg but good)
Brakes:
Waiting on caliper CAD to check interference before purchasing/sending request for caliper
BOM for all caliper components will be sent this Monday after call with MCP (caliper manufacturer)
One Limit Mount Design 3D Printed, Caliper mount design started (albeit with inaccurate caliper step file)
FSU:
Updated nodal has been added to bild
includes all three states of the suspension (max compression, ride height, and max extension)
It also shows the correct ride height that was settled on in space claim, and a spec'd shock
Design review for finalized FSU nodal on Saturday → afterwards math team can finish
RSU: Still working on knowledge transfer, meeting scheduled with Jon Monday @ 9PM
Nodal draft making more parametric
Battery
Cell selection: have a good list of 25 cells on the sheet
Overall pack config and architecture: have a plan, ready whenever regs drop
Cooling: goal for EOT to have a working wind tunnel and testing plan so we can be ready to test prototype modules w/ different cell candidates next term
Enclosure ideation: early brainstorming, nothing concrete
Exteriors
R&D completed on Thurs (surface bagging)
Good progress on solar array layout and canopy length, should be complete by Tues
Continuing iterations of the Aerobody, experimenting with 2D airfoil simulations
Int Structures
15.5
Chassis sims underway
supplier has higher YS on data sheet; also reached out and waiting response
Material testing
Steering changes looking to be finalized EOT
16
Have more parameters to work on for 16 chassis after space claim; looking to complete first pass by EOT
Operations
Registration documents all approved
IEF? Early bird registration ends Nov 30 → prices in FSGP channel
VSA president has been contacted (discount cards) - just waiting on a response
Posters should all be finished - will check in with Phillip during our meeting
Merch suppliers will be consolidated by this weekend to decide which one is best
Other
W25 Coops??
HV/Dyno Room Keys?