2024-10-12 Leads Meeting
General
ASC regulations for 2025 released
Next leads meeting cancelled due to midterms
Reminder: members can view ops purchasing form, but only leads can make purchases
Electrical
General HW Update : Tasks assigned at working sessions, give a general update for each category
BMS : Working on Improved AFEs to increase discharge rate, can configure discharge time to be more flexible, work with Firmware on this
Precharge validated and works, Jun (co-op) is helping with redesigning current Carrier Board
Planning a time to do Solar Testing after Midterms/Potentially vehicle testing sometime in November before potential snow kicks in
PCS Testing will be happening tonight
Coordinating HV Supply use with other teams?
Will be starting to work on PVDR/VDR on Elec for a early submission, co-op to assist with this
Elec Mech Integration Interiors : Board layouts(Center Console is being reworked)
General FW Update: Helping new members with their tasks + MS16 repo setup
Reworked pedal to improve responsiveness (Heard you had to push ~30-40% bfr you get any output, should be better now)
Watchdog/backup register drivers. More bootloader infrastructure
Hardware-in-the-loop discussions. Likely going to architect one this term (After midterms)
Will work with HW on this. It should be very scalable considering our car uses the same STM on every board
RTOS and HAL drivers are added to new repo
Mechanical
**PVDR due Nov 15, VDR due Jan 31
Conversations through Private Messages
First year design sprints can remain private, team progress keep public (aka keep them in mechanical, helps w transparency)
Meetings on discord
Review of Mech based funding requests
Space Claim 4 after midterms, open to discussions on discord through public channels
Bild Etiquette
Exteriors:
Car length: < Reg Maximum (5.8m)
Ideally between 5.6-5.7m
Check exact length of trailer - Evan checking after meeting
Finalizing plans for dynamic wheel covers
Finalizing width of bottom profile (1200mm)
Going with slightly curved side profiles
Research task for solar array area, canopy sizing
New safety equipment + chemicals to be purchased
Dean’s funding for R&D for exteriors
Chassis/Internals
PCB enclosure design sprints for new members are underway
MS15.5 Waterproofing - research to be done
Rollcage development is still underway
Possible wheel position rule may impact wheelbase length and position (see wheelbase extension thread @ mechanical) → chassis position
prioritize solar panel area
will be more dynamics integration questions that arise - will happen between now till space claim 4 (ex. possible track extension for turning radius)
please get approximate mass and CG location for your system before space claim 4 - will be helpful with chassis design decisions
Front wheel has to be 60% of car’s length from front plane (could be a possible regulation, won’t know until 2026 regs are released)
Battery
MS15.5:
Finished making adjustments and reprinting inlet, need to reprint outlets (accidentally thrown out)
Enclosure removal tool (4 members) - meeting on 10/30/2024 from 8:30-9:15pm to go over design and approve the MS15.5 removal tool for manufacturing
MS16:
Researching cells - Excel sheet updates in-progress. Cell testing will start next term
MS16 Enclosure ideation - gave rough overall scope of design requirements for MS16 enclosure, (2 total), ideating early-waterproofing concepts
Thermal sims - ideating test procedure comparing the relationship between the number of cells in parallel in relation to temperature. Considered manufacturing modules with different parallel counts and recording temperature produced in a closed-enclosure. Meeting with @Shem Kim and @Vaibhav Bommalapalayam after midterms to discuss further
Module root cause analysis - corrosion occurrences on over-discharged cells - will email profs for help with root cause analysis
** FYI new 3d-printing channel under mechanical for all things 3D printing related
$5000 for future cells (MS16)
Dynamics
Rear hub design Sprint
3 groups
FEA November
Suspension Nodal & Research Update
FSU - occupancy cell dimensions are now set, nodal has begun and should have a basic nodal drawing for Tuesday. Research will continue over reading week and midterms; four-bar linkage and bell crank design are what we are researching most.
Shock has been specked. The spring that is picked will depend on force calcs further down the road.
FSU MVP Nodal ready before midterms (probably)
RSU preliminary updates in MS16
Steering Nodal
Working on nodal
Calcs for optimizing nodal, matlab script for this week
Documentation starting
Brakes
MS15.5 OTS part spec update: ideally ordered in November
Changing tilt of brake pedal, limit switch reconfiguration,
Operations
Post for CAGIS is finished - planning on starting with monthly/biweekly updates on instagram (if there’s anything you want featured lmk)
WEEF and ENGSOC internal funding outlines are all good to go, just need to fill it with our sub team updates, and some of the funding requests (all funding requests have to be made by next Saturday in the morning AT THE LATEST)
Submit proposals by next Thursday/Friday
Dean’s Funding thread to be made in discord
At least 2 instagram posts for jlcpcb for their sponsorship + at least 1 PR/project/technical article
Aden - A confluence page on things like NDA policy/confidentiality would be good I think : would like some thoughts on this