/
(01-11-2025) Structural Leads W25 meeting

(01-11-2025) Structural Leads W25 meeting

Agenda

  • 15.5 Deadlines

  • 16

    • Rollcage

    • Main frame

    • Budget

    • Timeline

 

15.5 Deadlines

  • Steering column

    • Decide on thickness of steering column: 0.75” x 0.083” wall thickness

    • Get from E3 monday

  • Floor panels

  • Mass reduction

    • pocketing ribs

    • talk to Jaiden on tuesday on time

    • done same time as floor panel

  • Board covers

    • End of this month / mid feb

 

16 Rollcage

  • Iterating on Design

 

  • timeline: on track

    image-20250111-200038.png