(09-25-2024) Structure Leads Meet up
Egress Direction
Egress direction jig
design matrix
pros and cons
Rollcage sims
play with the thickness of tubes
Main points
only care about above-the-shoulder
if stress concentration below the shoulder that is fine
The roll hoop is intact
Dynamics Integration
FSU: leading arm; essentially a mirror of the trailing arm + mounting points for shocks (bellcrank + point for lower shock)
establish the direction of rotation for FSU shocks (horizontal or vertical shock)
Brakes
Establish mounting config (wall mounted vs floor mounted, off the shelf vs self made)
Battery Box
Have to confirm final battery space, where they want it and probable interference with RSU
Misc
ansys license getting set up, licenses handed out in case by case basis
ansys knowledge transfer after that is set up