(09-25-2024) Structure Leads Meet up

Egress Direction

  • Egress direction jig

  • design matrix

    • pros and cons

 

Rollcage sims

  • play with the thickness of tubes

  • Main points

    • only care about above-the-shoulder

      • if stress concentration below the shoulder that is fine

    • The roll hoop is intact

 

Dynamics Integration

  • FSU: leading arm; essentially a mirror of the trailing arm + mounting points for shocks (bellcrank + point for lower shock)

    • establish the direction of rotation for FSU shocks (horizontal or vertical shock)

  • Brakes

    • Establish mounting config (wall mounted vs floor mounted, off the shelf vs self made)

 

Battery Box

  • Have to confirm final battery space, where they want it and probable interference with RSU

 

Misc

  • ansys license getting set up, licenses handed out in case by case basis

  • ansys knowledge transfer after that is set up