Rev 2.0 PS validation
Continuity test - rails
LDO_3V:
was able to probe proper connections
3V3TP:
was able to probe proper connections
GND:
need to probe again
SIG_GND:
need to probe again
VBAT:
was able to probe proper connections
DCDC_FUSED:
was able to probe proper connections
DCDC_UNFUSED:
was able to probe proper connections
AUX_BAT_IN: