This page will go over some of the bigger projects that we need to complete this term.



  • Organization
    • Organize IC bin
    • Organize heat shrink
    • Organize wires - make sure they are labeled, figure out what we need to order
  • Guides
  • Wiring
    • Spec the HV connectors
      • TE connectors similar to Formula Electric?
    • Spec LV power and signal wire
      • shielded? pre-twisted pairs?
    • Connectors on all wires that need to be removed
      • Create best practices guide
    • Figure out car wiring
    • Figure out electrical box mounting and positioning
  • Boards - Testing
    • Bring up and Validate All Boards
      • Maintain documentation on what is tested, how it was tested, etc.
  • Other Testing
    • Finish Testing Solar for MPPT Decision
    • Test Reflow Oven and create optimal profile
    • Create 36S 1P test jig for BMS
    • Create layout for electrical integration testing