Todo for Track Day June 9th:
- Finish front hub nut tool (Henry)
- Reprint charger enclosure (Catherine)
- 3D print splitters and install ventilation (Asher)
- Review trunk props (Emily)
- Check parking brake for functionality
- Bleed brakes (Daniel/Tom)
- Finish solarsense enclosure (Mabel)
- Secure driver display (done late Saturday)
Brakes Update: Brake calipers were removed and reattached June 6th, however have not been bled yet
Track day 2 will be different, as we have a real track and will be moving at much higher speeds. This means that the car should be in near competition condition (with the exception of things electrical has asked us to leave out). Priority will be brakes, testing should be done on Saturday to determine if brakes are in functioning order and if things need to be changed for the 15th.
Todo for Track Day June 23rd
- Install dashboard
- Install EV port charger (will involve removing right aero panel)
- Replace nylon insert nuts connecting aerobody with fujilock
- Install charger enclosure (Eric/Catherine)
- Finish and install parking brake (Shi Jing)
- 3D print c-clamps for attaching internal carbon fibre panels (Catherine)
- Finish wire system to hold down trunk (Sheila)
- Obtain jack (Michael)
- Obtain nylon shear pin (Michael)
Everything should be done by this day. June 15th is our last day of testing before competition and theoretically, no work should be needed on the vehicle between the 15th and competition. This is our deadline.