Battery Work Session Updates
- Jenna Kong
- Nicole Choe
Modules
Added inserts to the remaining top cell holders + top covers
Potted busbars for another cell holder, but ran out of busbars for more (waiting on the dwg file so we can cut another batch)
Measured cell voltages for another module's worth of cells
@Nicole Choe and @Taylor Elena Avery Hazelwood worked on enclosure jig manufacturing
@jenna k was working on CAD for aux. finished except securing mechanism needed to baffle, probs bolted connection
Enclosure:
Progress made on manufacturing modules. Manufacturing modules, but ran out of busbars - Vaibhav to message Caleb, who was in charge for water-jet files to forward the file to the group
Steel Flat Jig was tested and fits to chassis. Taylor cut 3/4 wood pieces needed for our enclosure jig, and I've asked her to cut holes for two of them. To be completed by Saturday
All screws set aside for Enclosure jig.
Tested another 32 cells for the module
Welding deadline for steel flat to enclosure is November 15th. Waiting for angle irons (hopefully in by wed 8th)
Enclosure panel MDF cutting needs to be redone - to be completed by Wednesday's working session (November 8th)
As soon as the angles arrive - Jenna to send a message @channel so machining can start as soon as possible.
3D Prints to be assigned by Shem, after his Enclosure Design meeting with Jenna
Finished milling steel flats, cut to-size +- 0.4mm (outside XV-BAT129 Steel_Cross_Bar cut -0.9mm). This issue will be fixed by welding. Disregard yesterday's 2mm undersize, that was a mistake
Finished cutting angle irons - will be milled to-size by tomorrow
Worked with Machine Shop Guy to plan cutting holes into parts using mill - will finish tomorrow
Validating Chassis Cross bar jig tomorrow by milling holes into a scrap 1/4" piece
1/4" Steel for Chassis Cross bar has not arrived yet. Will ping when metal arrives
MDF for the enclosure jig is all cut! Thank you so much @jenna k
HUGE SHOUT-OUT TO @Jericho Mordasiewicz @Taylor Elena Avery Hazelwood @Jason Siu @Evan McMahon for all your help today and for coming in tomorrow to finishing up the milling, you guys are awesome : ))) I will ping you guys to tomorrow's instructions in this channel in a thread (edited)
Michael has said resin for panel should be coming in next week (stated Nov 12)
Aux Battery
Cells have been tested, working this week to group cells and spotweld this week
Module Testing
Initial discharge test conducted, nothing on fire
Will work to get the code right for the daq to collect data for future tests for production modules
Module Manufacturing
Single and voltage taps completed
Voltage checked for cells for 12 modules
Enclosure
Chassis jig is within tolerance
Milled holes into Steel Flats and all but one angle iron
Assembled a portion of the enclosure jig
One of the MDF pieces needs to be re-cut. Vaibhav will create the drawing and get it done by Monday
Added another connector for solar relay to the enclosure cad. No more changes exist for the enclosure design. Left the connectors in our prototype box in the bay.
CAD a cap for impounding for the new connector added (required by regs). He finished the CAD so I will review tmrw, but it’s relatively simple so I don’t imagine there should be any problems.
Made confluence page for all electrical components inside enclosure. List of Things Going in the Enclosure