Battery Box Meeting Notes [MSXV]
- Jenna Kong
- Shem Kim
- Nicole Choe
Aux Battery
Tested 25-ish cells (approx 60 total)
Probs finish testing after CAD deadline for 24
CAD - need mount (will be late by few)
will upload to github EOD
Cells may need balancing, will add balancing taps
Deliverable: Finish the CAD for the 24th
Enclosure
Design overall → opening mechanism not optimal
Will recad with bare min.
will host a design sprint with first years (sometime week)
optimize for air intake
Box will rest on the floor of aero
Shem → working on removal tool
Manufacturing enclosure will have to wait
fireproof resin??
top, bottom, holder will print (module)
Ports have been found, need to confirm
Same as MSXII
Wire gauge - ? 2-6 AWG?
hw → harnessing tell them (jenna)
high current speccing
It was determined the module holders will be epoxied to the base of the enclosure
Reviewed w. Micheal the manufacturing process/considerations
Deliverable: Tuesday get a new timeline for the enclosure + Design review
Board Mounts
Integration meeting happened, got lots of info for mounts
AFE almost done, carrier and current sense not
Ideal for current sense and carrier to be on top of each other
Saturday → sprint for mounts
Redesign, two brackets instead of two brackets and top plate
AFE and carrier the same size
Improve space for wiring, add standoffs for the mount
PVDR
Use the MSXVII PVDR as much as possible
Review Sunday 17th 7PM
Module Testing????
Manufacturing state → as soon as possible
Kostubh will draft a testing procedure for the pack to validate
Cell testing/validation → completed
Manufacturing guideline → test + revise as needed
Will be there Monday to discuss
Coulomb Counting
Telemetry moved to low-priority task
Discussed with integrations and will try to have all state of charge calculations local on the board itself
Driver can manually read out the state of charge via radio
Looking into different integration methods for calculating SoC on STM32, should have some research by the next integrations meeting on Tuesday
Will be compared with IC board that Forest found to see which is more accurate
currently doing research on viable algorithms and will be checking in with integrations on tuesday on our next steps based on the research
This week:
Apply for passes (HTN): shem, nicole, maggie, vaihbav
Nicole → rch session for first years
Summary: Got bodied but tight deadlines before manufacturing can proceed
Module
add ribs to the L bracket of the module holder
Make into one part
Vertical mounts - make sure there is enough space/strong for heat insert
Test the module to module connections
Shift the hole to eliminate divet in plate
Cell Holder
ABS → look into printing services (Micheal, WatIMake)
Busbars
Only have sigma clad for module to module connections
Nickel to nickel for parallel + series connections
Due to spot-welding limitations
Conduct resistivity test of connections
Module to Enclosure Design
Hex caps MAY interfere with one another
M3 may be too weak
Find hardware to fit
Module to AFE
Highest temp will be in the center
Change number of thermistors to 24 → change layout
Manufacturing
Test material resistivity
No thermal test
Need a way to measure ambient temperature (post manufacturing)
Strat will need this data
Electrical Connections
Figure out a way, low prio, copper bar works for now
Chaos
New members starting to integrate (assigned to projects on Sat)
Production Module Testing (4.5.3)
keysight: not feasible too long
two paralle
possible solutions for worst case:
ask other people? not done yet
ask profs
maybe past documentation
ask teerstra
ask lab in waterloo
talk other design teams
ask prof for battery challenge
Current assessment of module manufacturing & testing
all modules to be completely manufactured: dec 8th
will have to check with testing the first module
do we have prototype module testing goals?
draw for 30min and check temperature
asc does not outline anything specific
Prototype module testing:
depends on what we say
will say it was first one made (of the production run)
documentation needed? no but yes (for future etc)
keep prototype deadline same on pvdr but aim for end of nov
continue to test for production
Pack & battery systems validation
different equipment?
either use motor or power resistors
have a completed plan before jan 2024 (check-in mid-dec)
Actionables:
module manufacturing timeline done for 06-11 (will check with donna)
working on on validation plan - check monday 05-11 and review (check with owen)
jenna will start prototype testing this week, feasibility test (check-in end of week)
just draw current 58.2 A and 3.6V with module
why are baffles being redesigned?
bc safety wire
too much wire around the box
not checked
will not push to git, keep to safety wire
Design change
one extra cutout need for molex connector
air duct been designed?
cad changed for fan folders to accommodate for air duct (completed)
will be stuck with tape
once air duct connector cad done will check with jenna
Machining
only a few extra inches to the order
jenna will assign to experienced machining people to get it done
3d prints
fan holders (problem with heat set)
two seem viable from prototype, will be used for module
Hydrophobic mesh for inlet will look into it now -shem will do
enclosure feet: petg
will might need to modify according to weld bead
can we print right now? yes can print, but might need to modify to fit bolts to chassis
air baffles and diagonal supports can print right now
Electrical integration
wires who will buy?
so far know:
can use hardware money (can check confluence page)
all connectors for wiring in and out of box
deliverable: have a list of everything in battery box in electrical that is not module in enclosure (for saturday working session 11-11) will confirm with jonathan/forest
fans, connectors, etc
jigs
crossbar is good
chassis is good
mdf
jenna will let nicole know when done to check
welding
what happens if it sucks?
if too small use 1/8 inch board
if too big: need to redo or grind down bars
summary of deliverables:
shem:
list of electrical components/stuff in enclosure (everything but the modules) for 11-11-2023
assign 3d printing to new members on sat 11-11 (enclosure feet, air baffles & diagonal supports)
send update about asc email 05-11
Hydrophobic mesh for inlet 11-11
nicole:
jigging as soon as everything is done
machining to be done?
jenna:
will cut mdf (will be checked by nicole for wed)
modify aux bat for securing m4 for 10-11
air duct will confirm with micheal there is 2
assign machining as soon as gotten
update: email from asc securing method can be done with pack itself
sealing required for impounding
can secure another method post-assembly for during race (ie. fishing wire through modules)