Dynamics Milestones
Dynamics Milestones and Deadlines
Milestone | Owner | Deadline | Status |
---|---|---|---|
Assemble steering by End of Next Week (everyone in person on sat) |
| May 17, 2024 |
|
Find Housing (machined by Forest) @Carmelli |
|
|
|
Steering INTEGRATE STEERING CAD @Jonathan Xie Drill 2 holes in center bar w/ jig @Carmelli Better jig @Ahnaf Mamun drill hole in steering arm @Matthew Scorcia @Forest Zhou @Caleb Mengistu edge find on 2 axis -> plane of welded plates, very tight tolerancing get a drill bit for position (get machinist square and make sure Jig for weld for centre bar plate @Caleb Mengistu Chopsticks cut to length Control arms need to be grinded a bit (sand down) |
|
|
|
Tie Rod Welding Call Nate Roberts (nano guy) to approve of design before sending it off to Rob to weld @Carmelli Reweld tube to master cylinder mount @Carmelli |
|
|
|
RSU Routing brake lines to brake pedal Machine Spacers @Carmelli @Caleb Mengistu Rear Caliper Mount Redesign @Jonathan Xie |
|
|
|
Brakes Brake pedal wobble fix Hand lever needs to be put in car @ jaiden cut holes into floor panels Routing brake lines to parking brake @ ahnaf Parking brake caliper attached to steering arm PARKING BRAKE CALIPER REDESIGN @Ahnaf Mamun Shave off part of diameter for pistons so there is more distance between threads Bleed brakes, buy brake cables |
|
|
|
FSU |
|
|
|
Wheels |
|
|
|
Cotter pins jig Preload calculator @Richard Wang @Jens Dekker → this weekend |
|
|
|
Flex loc suppliers for free? 56 x M8??? |
|
|
|
What interferes when you steer?
UCA/LCA with rim
LCA shock clevis
chamfer edges away
Cenrebar hits chassis/bolt
Parking Brake Mount
Steering:
portion behind upright is 18, portion in front is 14
jens says 16/11
Questions
Cotter pin installations