Electrical
Mechanical
Conversations through Private Messages
Review of Mech based funding requests
Space Claim 4 after midterms, open to discussions on discord through public channels
Bild
Exteriors:
Car length: < Reg Maximum (5.8m)
Chassis/Internals
MS15.5 Waterproofing
Battery
MS15.5:
Finished making adjustments and reprinting inlet, need to reprint outlets (accidentally thrown out)
Enclosure removal tool (4 members) - meeting on 10/30/2024 from 8:30-9:15pm to go over design and approve the MS15.5 removal tool for manufacturing
MS16:
Researching cells - Excel sheet updates in-progress. Cell testing will start next term
MS16 Enclosure ideation - gave rough overall scope of design requirements for MS16 enclosure, (2 total), ideating early-waterproofing concepts
Thermal sims - ideating test procedure comparing the relationship between the number of cells in parallel in relation to temperature. Considered manufacturing modules with different parallel counts and recording temperature produced in a closed-enclosure. Meeting with Shem Kim and Vaibhav Bommalapalayam after midterms to discuss further
Module root cause analysis - corrosion occurrences on over-discharged cells - will email profs for help with root cause analysis
** FYI new 3d-printing channel under mechanical for all things 3D printing related
Dynamics
Suspension Nodal & Research Update
Steering Nodal
Brakes
MS15.5 OTS part spec update:
Operations
Other
General
Content
Integrations