  1. Electrical

    1. General HW Update : Tasks assigned at working sessions, give a general update for each category

      1. BMS : Working on Improved AFEs to increase discharge rate, can configure discharge time to be more flexible, work with Firmware on this

      2. Precharge validated and works, co-op is helping with redesigning current Carrier Board

      3. Planning a time to do Solar Testing after Midterms/Potentially vehicle testing sometime in November before potential snow kicks in

    2. PCS Testing will be happening tonight

    3. Coordinating HV Supply use with other teams?

    4. Will be starting to work on PVDR/VDR on Elec for a early submission, co-op to assist with this

    5. Elec Mech Integration Interiors : Board layouts(Center Console is being reworked)

    6. General FW Update: Helping new members with their tasks + MS16 repo setup

      1. Reworked pedal to improve responsiveness (Heard you had to push ~30-40% bfr you get any output, should be better now)

      2. Watchdog/backup register drivers. More bootloader infrastructure

      3. Hardware-in-the-loop discussions. Likely going to architect one this term (After midterms)

        1. Will work with HW on this. It should be very scalable considering our car uses the same STM on every board

      4. RTOS and HAL drivers are added to new repo

  2. Mechanical

    • Conversations through Private Messages

    • Review of Mech based funding requests

    • Space Claim 4 after midterms, open to discussions on discord through public channels

    • Bild

    • Exteriors:

      • Car length: < Reg Maximum (5.8m)

    • Chassis/Internals

      • MS15.5 Waterproofing

    • Battery

      • MS15.5:

        • Finished making adjustments and reprinting inlet, need to reprint outlets (accidentally thrown out)

        • Enclosure removal tool (4 members) - meeting on 10/30/2024 from 8:30-9:15pm to go over design and approve the MS15.5 removal tool for manufacturing

      • MS16:

        • Researching cells - Excel sheet updates in-progress. Cell testing will start next term

        • MS16 Enclosure ideation - gave rough overall scope of design requirements for MS16 enclosure, (2 total), ideating early-waterproofing concepts

        • Thermal sims - ideating test procedure comparing the relationship between the number of cells in parallel in relation to temperature. Considered manufacturing modules with different parallel counts and recording temperature produced in a closed-enclosure. Meeting with Shem Kim and Vaibhav Bommalapalayam after midterms to discuss further

        • Module root cause analysis - corrosion occurrences on over-discharged cells - will email profs for help with root cause analysis

      • ** FYI new 3d-printing channel under mechanical for all things 3D printing related

    • Dynamics

      • Suspension Nodal & Research Update

      • Steering Nodal

      • Brakes

        • MS15.5 OTS part spec update:

  3. Operations

    1. Aden - A confluence page on things like NDA policy/confidentiality would be good I think : would like some thoughts on this

  4. Other