  1. Electrical

  2. Mechanical

    1. Mech budget - Generate list of items and cost. Expect frequent checkins

    2. Term goals defined between each team

      1. Exteriors: Back in december → MS16 MVP, manufacturing plan

      2. Dynamics: Jan 6 → Calcs (Check in end of jan), OTS spec, mech design start

      3. Internals: Jan 4 → MS16 MVP, complete MS15.5 hands on, MS16 Jig design

      4. Battery: Jan 4 → Module design start, cell testing, enclosure start (# of member dependent)

    3. Onboarding plan finalized offline (tasks in event of new members)

  3. Operations

    1. High level overview of expenses for each sub team is required

  4. Other

    1. SDC open house Jan 15 starting at 4:30

    2. First Gen Jan 16 at 6:30-8:30 in E7 4417

    3. IEF Conference happening 17-19 (Matt, Ben, Aryan, Carmelli will be off site)