IMU Revisions

Revision 1

Retrospective

  • Add a testpoint for GND
  • Reduce board size (current is 5cmx5cm)
  • Move U2 (unity gain buffer) closer towards P3 (external thermistor connector)
  • Move U3 (3V LDO) closer towards the micro controller's 3V source