  1. Electrical

    1. Firmware:

      1. FIRMWARE COOP W25: Interviews Dec 3-5. Release rankings by Dec 5 at 8 PM.

      2. Flashing and GPIO’s work on the new controller board! But RTOS is broken Will be fixed today

      3. Published Doxygen Website for Firmware Code Documentation

  2. Mechanical

    1. W25 Internal Structures Coop → Interviews start Dec 5-7

    2. EOT Design Reviews: Dec 19th-Dec 23th

      1. Rear Hub → select design, drawings ready by Jan 6th

      2. Detachable steering → if design ready, parts will be order over Christmas break

      3. MS16 Developments up to now

    3. MS15.5 VDR revisions over the break

    4. Exteriors Term Wrap-up:

    5. Internal Term Wrap-up:

      1. MS15.5 Chassis Resim update

    6. Battery Term Wrap-up:

    7. Dynamics Term Wrap-up:

      1. Parking Brake Rehaul BOM due Dec 13th

      2. Brakes: No interference on MCP 650 caliper we can purchase 😄 → confluence page all about this caliper posted (including mounting, caliper specs, etc), check dyn-brakes for info

      3. Rear-Hub: All designs pushed to confluence, FEA was unfortunately not completed for all parts will have to discuss the next steps

      4. FSU: Calculator completed, FSU team will lock down nodal after finals

      5. Steering: Loading calculator started, will be complete before Dec 13th, and will lock over-top and middle nodal before w2025

  3. Operations

  4. Other