Electrical
Mechanical
EOT Design Reviews: Dec 19th-Dec 23th
Rear Hub → select design, drawings ready by Jan 6th
Detachable steering → if design ready, parts will be order over Christmas break
MS16 Developments up to now
Parking Brake Rehaul BOM due Dec 13th
MS15.5 VDR revisions over the break
MS15.5 Chassis Resim update
W25 Internal Structures Coop → Interviews start Dec 5-7
Operations
Other
General
Content
Integrations