Electrical
Mechanical
EOT Design Reviews: Dec 19th-Dec 23th
Rear Hub → select design, drawings ready by Jan 6th
Detachable steering → if design ready, parts will be order over Christmas break
Parking Brake Rehaul BOM due Dec 13th
MS15.5 VDR revisions over the break
MS15.5 Chassis Resim update
W25 Internal Structures Coop → Interviews start Dec 5-7
Operations
Other
General
Content
Integrations