Meeting Notes 08/30/2024
Pack Characterization
GOAL: Program an Eload to discharge module, and if possible the entire-pack to get discharge curves by September 8th
Resistance-Testing Plan
Q: ask Aryan what a general-process of this would look like
Vibrational Testing
Learned from co-op that vibrations are a way that packs can die
Q: