Day 1:

  1. Bring enclosure frame and panels to the machine shop

  2. Grab epoxy from ??? - have to confirm whether we are buying our own stuff, Shem ordered or Michael already has some somewhere

  3. Clamping bottom panel: put something heavy (with one object towards the middle that does NOT move) to keep it more steady

  4. Clamping width pieces: should be straight forward because there are holes in the fibre-glass due to vent + fan holders

  5. Clamping length pieces: ~3.5cm from the top of the steel frame to the top of the fibre-glass. Grab the metal clamps from the drawer in the bay and clamp the top. To ensure the bottom is flush grab something heavy and place along the bottom and sides

  6. Wait for epoxy to dry

Day 2:

  1. Apply adhesive gasket to the two side-pieces of the lid. If that is not strong enough, epoxy, clamp, and let dry for 24 hours before proceeding

  2. Measure the distance and ensure the two side-pieces of the lid are at the appropriate length away from the edges

  3. Measure the distance between the edges with calipers and ensure it is the same alongside the entire edge. Mark edge of fiberglass with a pen/marker

  4. Use the middle panel to act as a validation check and ensure there is enough space for it to fit

  1. Apply epoxy, and put something heavy on the edges to weigh the panel down

  2. Finish machining fixtures on the lid of the enclosure for impounding (ask Shem for status on that)