Day 1:
Bring enclosure frame and panels to the machine shop
Grab epoxy from ??? - have to confirm whether we are buying our own stuff, Shem ordered or Michael already has some somewhere
Clamping bottom panel: put something heavy (with one object towards the middle that does NOT move) to keep it more steady
Clamping width pieces: should be straight forward because there are holes in the fibre-glass due to vent + fan holders
Clamping length pieces: ~3.5cm from the top of the steel frame to the top of the fibre-glass. Grab the metal clamps from the drawer in the bay and clamp the top. To ensure the bottom is flush grab something heavy and place along the bottom and sides
Wait for epoxy to dry
Day 2:
Measure the distance and ensure the lid is at the appropriate length away from the edges
Measure the distance between the edges with calipers and ensure it is the same alongside the entire edge. Mark edge of fiberglass with a pen/marker
Use the middle panel to act as a validation check and ensure there is enough space for it to fit
Apply epoxy, and put something heavy on the edges to weigh the panel down