Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Date + DRI

Update

To do next

Notes

July 10 - Min

  • sanded 4th side panel to 400 grit

  • primed side panel 2

  • sand side panel 2

  • continue side panel 4 during spare time (for members

side panel 2 has some rough spots, maybe a tad bit of lower-ish grit? like 200-300 for a tiny bit

July 12 - Maciek

  • Sanded 4th and 2nd side panel mold fully

  • Took “measurements” of the back half of the side panel

  • Check up on the two side panels to see if they’re ready (I think they are)

  • Take measurements of the front half

  • There may be a few spots that we missed but overall, they look nice and shiny

  • No labels