Track day 2 will be different, as we have a real track and will be moving at much higher speeds. This means that the car should be in near competition condition (with the exception of things electrical has asked us to leave out). Priority will be brakes, testing should be done on Saturday to determine if brakes are in functioning order and if things need to be changed for the 15th. 

Todo for Track Day June

...

23rd

  •  Install dashboard
  •  Install EV port charger (will involve removing right aero panel)
  •  Replace nylon insert nuts connecting aerobody with fujilock
  •  Install charger enclosure (Eric/Catherine)
  •  Finish and install parking brake (Shi Jing)
  •  3D print c-clamps for attaching internal carbon fibre panels (Catherine)
  •  Finish wire system to hold down trunk (Sheila)
  •  Obtain jack (Michael)
  •  Obtain nylon shear pin (Michael)

...