  1. Electrical

  2. Mechanical

    1. EOT Design Reviews: Dec 19th-Dec 23th

      1. Rear Hub → select design, drawings ready by Jan 6th

      2. Detachable steering → if design ready, parts will be order over Christmas break

    2. Parking Brake Rehaul BOM due Dec 13th

    3. MS15.5 VDR revisions over the break

    4. MS15.5 Chassis Resim update

    5. W25 Internal Structures Coop → Interviews start Dec 5-7

  3. Operations

  4. Other