  1. Electrical

  2. Mechanical

    1. Dynamics 💯

      1. Rear-Hub: Members working on Spindle FEA, looking to start Hub FEA this week 🛞

      2. Steering: On pause until FSU nodal/force calc updates ⏸️

      3. Brakes:

        1. Waiting on caliper CAD to check interference before purchasing/sending request for caliper 🤑

        2. BOM for all caliper components will be sent this Monday after call with MCP (caliper manufacturer) 📱 🇺🇸

        3. One Limit Mount Design 3D Printed, Caliper mount design started (albeit with inaccurate caliper step file) 🖨️

      4. FSU:

        1. Updated nodal has been added to bild 🔥

          1. includes all three states of the suspension (max compression, ride height, and max extension)

          2. It also shows the correct ride height that was settled on in space claim, and a spec'd shock

          3. Design review for finalized FSU nodal on Saturday → afterwards math team can finish 😈

      5. RSU: Still working on knowledge transfer, meeting scheduled with Jon Monday @ 9PM

    2. Battery

      1. Cell selection: have a good list of 25 cells on the sheet

      2. Overall pack config and architecture: have a plan, ready whenever regs drop

      3. Cooling: goal for EOT to have a working wind tunnel and testing plan so we can be ready to test prototype modules w/ different cell candidates next term

      4. Enclosure ideation: early brainstorming, nothing concrete

  1. Operations

  2. Other