  1. Electrical

  2. Mechanical

    • Conversations through Private Messages

    • Review of Mech based funding requests

    • Space Claim 4 after midterms, open to discussions on discord through public channels

    • Bild

    • Exteriors:

      • Car length: < Reg Maximum (5.8m)

    • Chassis/Internals

      • MS15.5 Waterproofing

    • Battery

      • MS15.5:

        • Finished making adjustments and reprinting inlet, need to reprint outlets (accidentally thrown out)

        • Enclosure removal tool (4 members) - meeting on 10/30/2024 from 8:30-9:15pm to go over design and approve the MS15.5 removal tool for manufacturing

      • MS16:

        • Researching cells (3 members) - Excel sheet updates in-progress. Cell testing will start next term

        • MS16 Enclosure ideation (3 members) - gave rough overall scope of design requirements for MS16 enclosure, (2 enclosures total), ideating early-waterproofing concepts

        • Thermal sims (2 members) - ideating test procedure comparing the relationship between the number of cells in parallel in relation to temperature. Considered manufacturing modules with different parallel counts and recording temperature produced in a closed-enclosure. Meeting with Shem Kim and Vaibhav Bommalapalayam after midterms to discuss further

        • Module root cause analysis - corrosion occurrences on over-discharged cells - will email profs for help with root cause analysis

      • ** we made a new 3d-printing channel under mechanical for all things 3D printing related

    • Dynamics

      • Suspension Nodal & Research Update

      • Steering Nodal

      • Brakes

        • MS15.5 OTS part spec update:

  3. Operations

  4. Other

...