Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

This is an iteration of tube removal optimization. The top 30 case failed, so this could only be pursued if that collision case is resolved.

Folder Path:

D:\Users\Roo\Documents\GrabCAD\MSXIV sims\MS-CHASSIS\Spring 2021 Reinforcement Sims

File Name:

October 11_Rev10.5

This project file was created using Rev 10.4 as the base project.


Updates from Rev 10.4:

  • Removed one pair of rear angled spiderweb tubes.


Front Bar - PASS

Back Bar - PASS

Side 30 Wall - PASS

Side 60 Wall - PASS

A-Pillar - PASS

B-Pillar - PASS

C-Pillar - PASS

Front 30 Wall - PASS

Front 60 Wall - PASS

Top 60 - PASS

Top 30 - FAIL

Top 30 - PASS

Top - PASS

Combined Loading (Roll-Over) - Incomplete

It is the case with the pucks.

It needs to be setup using previous examples.

Advisor: Jason He

It is slightly lower priority because the combined loading condition could be interpreted as an average of multiple cases listed above.

  • No labels