Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Dynamics Milestones and Deadlines

Milestone

Owner

Deadline

Status

Assemble steering by End of Next Week

Find Housing (machined by Forest) Carmelli

Steering

  • Drill 2 holes in center bar Carmelli
  • drill hole in steering arm
    • edge find on 2 axis -> plane of welded plates, very tight tolerancing
    • get a drill bit for position (get machinist square and make sure
  • Jig for weld for centre bar plate Caleb Mengistu
  • Chopsticks cut to length
  • Control arms need to be grinded a bit (sand down)
  • Remove shock, try a bunch of different positions to see if wheel hits control arm at other heights

Tie Rod Welding

  • Call Nate Roberts (nano guy) to approve of design before sending it off to Rob to weld Carmelli
  • Reweld tube to master cylinder mount Carmelli

RSU

  • Routing brake lines to brake pedal
  • Machine Spacers
  • Rear Caliper Mount Redesign

Brakes

  • Brake pedal wobble fix
  • Hand lever needs to be put in car @ jaiden cut holes into floor panels
  • Routing brake lines to parking brake @ ahnaf
  • Parking brake caliper attached to steering arm
  • PARKING BRAKE CALIPER REDESIGN
  • Shave off part of diameter for pistons so there is more distance between threads
  • Bleed brakes, buy brake cables

FSU

  • Plug the UCA/LCA, weld, cut
  • Shock clevis Interference
  • Cut upright spacer bushings (use calipers to measure, subtract width of a TimKen bearing) Carmelli

Wheels

  • inflate last wheel
  • 5th rim? → E3? 5k? pain

What interferes when you steer?

  • UCA/LCA with rim

  • LCA shock clevis

    • chamfer edges away

  • Cenrebar hits chassis/bolt

  • Parking Brake Mount\

Steering:

  • portion behind upright is 18, portion in front is 14

    • jens says 16/11

Questions

 Reference materials


  • No labels