Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 3 Next »

Last Meeting before Midterms!!

  1. Mechanical

    1. Battery: Waiting for Sarah to make cell purchase (can arrive right after midterms if no delays happen). Pack design in progress.

    2. Dynamics:

      1. Rear Hub drawings finalized

      2. FSU mech design started

      3. Steering mech design sprint introduced

      4. Pedal task update

  2. Electrical

    1. No significant updates, Solar cell tech report/Batt protection report/Battery report sent out to ASC/FSGP

  3. Operations

    1. Marketing

      1. MS16 logo design almost finalized, react to your favourite logo in ops-graphics

    2. Sponsorship

      1. Sponsorship potentially secured for rear hub, spindle

    3. Finance

      1. WEEF Proposals due March 6,

        1. Guideline for WEEF proposal: https://docs.google.com/document/d/1tX_V9ZZLAyruUS_0YwMDnZdbXwf3B-IaZNx6Xcwtztg/edit?tab=t.0

        2. Current WEEF allocations:

        3. https://docs.google.com/spreadsheets/d/1V4yUz8EjZCB78KKeBZ5JefzUg3Ql7SdXDFFWxUmVhuE/edit?gid=206716102#gid=206716102

      2. Exteriors/Composites: Finalize categories in Mech Budget list, request items that can be funded through EngSoc in #engsoc-requests-ws25

  • No labels