Task | Details | Person | Deadline |
---|---|---|---|
ANSYS & chassis CAD | Iterating the ANSYS collision scenarios and adjusting/optimizing the chassis CAD. Also keeping in mind DFM/DFA for VR3, following their tube manufacturing guideline. (MANY HOURS NEEDED) | July 19 | |
Gluing aero to chassis | Figuring out how we are mounting the aerobody panels to the chassis. | July 31 | |
Doors | Adjusting the door CAD geometry to fit the aerobody door panels. | July 19 | |
Materials testing | Figuring out how and where we are testing our carbon fiber. (tensile, shear, 3 point bend). | July 19 | |
Datuming chassis to mold | Figuring out a way to datum the chassis with the bottom mold. | July 31 | |
Chassis jigging | Creating CAD of jigs to hold the tubes for welding. | July 31 | |
Seat belt mounting | Figuring out how we are mounting the seat belts to the chassis, and ensuring we are following regulations. | July 31 | |
Firewall manufacturing | How are we creating our firewalls? Buying premade sheets, making it ourselves, etc? | July 31 | |
Seat mounting | Talking with interiors about seats & stuff. Preferably someone in Interiors. | Aug 31 | |
Suspension mounting | Figuring how we are going to mount it. | Aug 31 | |
Steering mounting | Figuring how we are going to mount it. | Aug 31 | |
Brakes mounting | Figuring how we are going to mount it. | Aug 31 | |
Battery box mounting | Figuring how we are going to mount it. | Aug 31 | |
General
Content
Integrations