Skip to end of metadata
Go to start of metadata
You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 26
Next »
Controller Board
| Validation Steps | Status | Blockers |
---|
CAN | | IN PROGRESS | |
GPIO_IT | | IN PROGRESS | |
ADC | | DONE | |
I2C | | IN PROGRESS | |
SPI | - General Hardware verification
| BLOCKED | Need SPI sensor to test further |
| | | |
| | | |
Centre Console
| Validation Steps | Status | Blockers |
---|
PCA | - Verify outputs of IO expander
| BLOCKED | |
Buttons | - Verify button presses are read in test task
- Test pressing all at once, ensure all events are received
| | |
7-Seg Display | - Check that you can enable/disable output
- Verify all 3 displays operating
| | |
Power Distribution
| Validation Steps | Status | Blockers |
---|
Outputs | - I2C write
- Verify operation of PCA9555 library (toggle_state, set state, init), make changes for storing values Arvind Sanjay
- I2C read (Mitchell Langdon Ostler)
- Verify Operation of Load switches using bts_load_switch driver Adhiraj Singh
- Verify Operation of Outputs using Output Config Adhiraj Singh
- Verify current readings
- Verify multiplexor with current readings
- Trigger Undervoltage/overvoltage conditions, see if it triggers interrupt (do after everything else in case board explodes)
| IN PROGRESS | |
Output Read verification | - Verify Outputs are successfully read in main loop
| BLOCKED | Need gpio expanders verified |
Lights FSM verification | - Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
| BLOCKED | Need all previous verified |
Power FSM Verification | - Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
| BLOCKED | Need all previous verified |
Telemetry
| Validation Steps | Status | Blockers |
---|
HC-12 | - Develop basic tooling and verify connection/data transfer
| IN PROGRESS | Getting hardware |
LoFa | - Develop basic tooling and verify connection/data transfer
| | |
| | | |
| | | |
| | | |
UV Cutoff
| Validation Steps | Status | Blockers |
---|
Load Switch | - Check that load switches work, and isense can be read
Preston Glicerio Dresser | IN PROGRESS | |
VBAT_Status | | | |
| | | |
| | | |
| | | |