Requirements

module testing v1: a lot of learnings about assembly, module design, testing procedure

https://docs.google.com/presentation/d/1JDEer-u4Yr4Mk4oCo_1GBLdfuhWZVZmIjVZzzzjlBpI/edit#slide=id.g24659019c9b_0_12

  • testing documentation

  • assembly documentation

module testing v2: shits getting serious

  • mechanical design
    • fit check
      • boards | waiting on boardmounts CAD to be finished to make final CAD revisions of module top plate (only 3 modules will need the AFEs on top, the other 6 can be left)
      • taps
      • current sense
      • wiring
      • thermistors
      • busing
      • cells
      • fixturing (screws, inserts, etc)
      • module to module
        • fixturing??? We will need to find insulating bolts/fasteners for module to module connections. Unsure if Eric ordered them already or if they need to be ordered. This means busbars will need a revision as well to make it electrically insulated
      • module to enclosure
        • fixturing??? Nicole working on module to enclosure securing
    • electrical performance
      • busbar to cell
        • thermal/electrical performance (<60C)
        • protection? fuse capabilities?
        • manufacturability/reproducibility
      • module to module
        • electrical/thermal performance
          • pressure & SA calcs (hard to test)
          • <60C
    • monitoring & bms
      • balance taps
        • location
        • quantity
        • wiring
      • thermistors
        • location
        • quantity
        • wiring
      • current sense
        • location
        • quantity
        • wiring
      • boards
        • AFE’s…

Overall, I think we should focus on getting the entire system rolling, rather than optimizing thermals, etc…

  1. BMS

    1. get mitch all the info he needs

  2. Motor Testing (since we can’t push modules with e-loads, lets just push it with the motor…)

    1. Motor controller

  3. Pack characterization

    1. coulomb counting

  4. Update documentation as we go

Kostubh’s Time Allocation

  • Module R&D completion oversight

    • All focus on Eric’s CAD

    • Down to redesign busing

    • Calcs

    • Oversight…

  • Coulomb Counting

  • Telemetry (Not really)

  • Anything else? How can I be most helpful

Onboarding

  • Focus on trial & error don't bombard kids with info, I think we do too much research

  • Design logs/documentation (helps the team and you)

  • No labels