We need to mount a charger and a charge monitor inside the car. This page will keep track of the proposed location and design ideas for those mounts.
The charger connects to the EVSE (Electric Vehicle Supply Equipment), J1772 connector inlet, the charger interface board, the ASC Charge Metering board, and the Elcon charger.
To start, gather info about each of the systems by browsing confluence and keep track of it below. Pictures and a diagram of connections would be great! This page should focus on the mechanical aspects, and a quick sentence or two about what each component does and why it is required.