Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 11 Next »

Weekly Goals

Week

End of Week Goals

July 5 - 11

Chassis: (All done!)

  • Access to Welding Room

  • Finish sanding & assembling jigs (done)

  • Drop off parts for welding

  • Assembly more jigs

  • Welding components onto Chassis

Aero: (Bleeding into week of July 12 - due to booking conflicts with Waterloop)

  • Side Panel Molds ready by the end of this week for layup

Battery Box:

  • Continue module manufacturing

July 12 - 18

Chassis:

  • Pick up waterjet parts - End of the week

  • Sand chassis, assemble more jigs

  • Schedule welding in E5 - welding components onto Chassis

    • Clamping tubes prior to welding

Aero:

  • Finish prepping side panel molds - end of the week

  • Begin material prep for side panels layup

    • blocked by no driver - see if we have a driver???

    • drawings are ready

  • Make a decision if we want to layup both - yes to both

  • finish side panel molds 3, 4

  • b bulkheads sand, potentially make blank and machine second mold as well (based on SDC)

    • first b-bulkhead sanded

    • second b-bulkhead - in progress

Composites:

  • infusion testing Saturday

  • Double check prep work for the infusion testing session (Friday)

    • use mold release/PVA, don’t apply Loctite

July 19 - 25

Chassis:

  • Pick up waterjet parts - Early this week

  • Submit work request and drop off parts at E3

  • Sand chassis and (maybe) tack weld seatbelt mounts

Aero:

  • visit cold storage to pick up adhesive film

  • chassis measurements for b-bulkhead

  • layup on thursday

    • mold release on side panel 1 and 2

    • connect the molds

    • material prep (nomex, vacuum bag, breather cloth, peel ply)

    • pick up kerosene

    • trim carbon fibre and adhesive film

Battery Box:

Composites:

  • next infusion test - Michael

    • next week

    • for this week, prep materials

July 26 - Aug 1

Instructions: Please fill this out BEFORE the onsite check-ins

Date

Individual

Goals for Today

Progress / Updates

Micah Black

Continued Battery Spot Welding

July 8, 2021

Mackenzie Lui, Kyle Lacson

Transport excess material to cold storage facility, set up paint guns.

Paint guns

  • No labels