Ownership
Testing/Validation DRI | Contributors | Project DRI |
---|---|---|
None |
Task Chart
Task | Status (type “/status”) | Notes |
---|---|---|
Find the main material for the cover | COMPLETED | |
Research material specifications | COMPLETED | Hand to Renzo by the end of the week |
Clean up detailed design research | COMPLETED | Check with Adrian on numbers |
Manufacturing research | COMPLETED | |
Mold research | COMPLETED | |
Waterproofing | COMPLETED | |
Finishing | IN PROGRESS | Might not be as important EVERYTHING IS IMPORTANT - DAPHNE |
Item list of parts and how they will be manufactured (roughly) | COMPLETED | |
Main material sourcing and pricing | COMPLETED | |
Foam molds | COMPLETED | |
Manufacturing research | IN PROGRESS | |
Infusion equipment | IN PROGRESS | |
Manufacturing plan | IN PROGRESS |
Assistance Task List (type “/action item”)
- Check-in Daphne Lai (Deactivated)
- Double check calculations with Adrian
Material Detailing
Summary of materials to buy
Fiberglass - 9oz or similar woven cloth
Resin - Epoxy resin
Foam - Urethane foam
Quantity not determined yet.
All available on compositescanada.com
Math
Manufacturing Detailing
Table of Processes (type “/h4”)
Process Name | Details | Notes |
---|---|---|
Wet layup |
|
|
Infusion |
|
|
For the current cover design, a mix of both manufacturing processes is viable and is probably the best choice in terms of reducing time spent manufacturing and resources used.
Part Name | Mold and Manufacturing method | Notes |
---|---|---|
Top cover (Front) |
|
|
Top cover (Rear) |
|
|
Inner walls |
|
|
Front side walls |
|
|
Rear side walls |
|
|
Rubber seal |
|
|