The project planning document should contains the following information:
Project Team Chart
Project DRI & Team
Interdependencies
Stakeholders
Problem Breakdown
Background
Needs statement
Major goals
Requirements/Regulations
Project Planning Review and Design Kick-off
Project Team Chart
 Click here to expand...
Project DRI
Project Members
Subteam Lead & PM
Interdependencies & Stakeholders
@Name
Form-factor: @Name
Mtl’s/Mfr/Assem: @Name
Testing/Validation: @Name
Aspect: @Name
Lead: @Name
PM: @Name
Mechanical:
Aerobody: @Name
Hardware:
Light Boards: @Name
Firmware:
Lights Driver: @Name
Problem Breakdown
Background
 Click here to expand...
Headlights are one of the requirements listed by the American Solar Challenge (however not required for the World Solar Challenge). For MS XIV, the headlight unit will contain two types of lights: Daytime Running Lights (DRL’s) and Front Turn Indicators.
Needs Statement
 Click here to expand...
i.e A need exists for a headlight unit that meets the DRL (Daytime Running Lights) and front turn signal regulations (ASC) while maintaining good vehicle aerodynamics, minimal energy consumption, and is aesthetically pleasing.
Major Goals
 Click here to expand...
Have complete and functional headlight unit
Meets lighting regulations (ASC and WSC)
Mechanically and electrically reliable & robust
Minimally disruptive to vehicle aerodynamics
Minimal power consumption
Aesthetically pleasing
Relevant Requirements/Regulations
 Click here to expand...
Battery Cover
Material
Non-conductive on the inside (not carbon fiber)
Possibility of adding some some of ceramic fiber / ceramic blanket / ceramic paper to the inside to contain heat in the event of thermal runaway
Strength
Access Cover
Need to be able to service the battery modules
Entire area above the modules must be open when the access cover is open
The modules will be installed by lowering them vertically into their slots
Rear Electronics Cover
Material
Non-conductive on the inside (not carbon fiber)
Strength
We will be climbing over it during egress
There will be 2 supports inside, running along the length of the catamaran
TBD if these will be structural, currently their only purpose is to separate HV/LV (High Voltage and Low Voltage) sections inside the rear electronics enclosure