Date
Attendees
Agenda
- Recap Spring 17 for off stream members
Minutes
Item | Who | Notes |
---|---|---|
Brakes | Adam |
|
Chassis | Adam |
|
Doors | Devon |
|
Driver Controls | Adam |
|
Suspension | Adam |
|
Aerobody | Adrian |
|
Battery Box | Adam |
|
Action items
Aerobody 2/3 people + 2 months
- Refinied surfaces
- Key Blends
- Overlaps, flanges
- Fasteners
- Molds
- Hinge Pivot Points
- Weight reduction on Aluminum Parts
- Windows Windsheild
- Stiffening in rear panelling
Battery Box
- Module CAD has to be finished (Bus Bars)
- Reliability for removability and connectivity
- Box Interals
- Routing Plan (mind radii)
- lower inside rail only has one mounting point
- Weight reduction on Battery Box Mount
- Vibe testing
- Charger Rounting CAD
- Dimple JIG CNC work
Chassis
- Send out Tabs (missing old style bear claw tabs)
- Send out Tubes
- Prepare Jig
Doors
- Finish bracket for the handle (Subject to change based off of aerobody)
- Model internal handle
- model foam, and mounting for aerobody panels
- analysis on door to ensure yielding on 5g
Steering
- tie rods
- Collapse Sleeve (Sleeve + flanges)
- Heim Joint (rod ends)
- Wheel + elec + Interface
- clock spring + wiring
- bearing speced
- thrust bearing/bushing for collapse sleeve
- Tabs
Brakes
- Purchase remaining parts
- Rotors can be used, but shims may need to be used in brakes (wilwood said current setup is fine)
- Scrub bobbin CAD
- Drawings
- Design return Spring for the brake pedal
- Put encoder on the brake pedal
- E-brake handle and caliper mount
Suspension
- Steering arms
- parking brake mount
- low conrtol arm
- redo analysis
- weight reduction
- Bump Stops
- specced bushings
- wheel interface needs to be revisited
Miscellaneous
- Fasteners
- Part numbers