Electrical
Firmware:
FIRMWARE COOP W25: Interviews Dec 3-5. Release rankings by Dec 5 at 8 PM.
Flashing and GPIO’s work on the new controller board! But RTOS is broken Will be fixed today
Published Doxygen Website for Firmware Code Documentation
Mechanical
W25 Internal Structures Coop → Interviews start Dec 5-7
EOT Design Reviews: Dec 19th-Dec 23th
Rear Hub → select design, drawings ready by Jan 6th
Detachable steering → if design ready, parts will be order over Christmas break
MS16 Developments up to now
MS15.5 VDR revisions over the break
Exteriors Term Wrap-up:
…
Internal Term Wrap-up:
MS15.5 Chassis Resim update
solid sims, promising but lets try to continue with mass reduction of systems if possible
Material properties:
70000psi (480MPa) YS from EMJ
samples to be tested next week
Steering stalk + floor panels to be finalized and ordered over winter break
Aim to finish first pass of chassis end of term
Battery Term Wrap-up:
…
Dynamics Term Wrap-up:
Parking Brake Rehaul BOM due Dec 13th
Brakes: No interference on MCP 650 caliper we can purchase 😄 → confluence page all about this caliper posted (including mounting, caliper specs, etc), check dyn-brakes for info
Rear-Hub: All designs pushed to confluence, FEA was unfortunately not completed for all parts will have to discuss the next steps
FSU: Calculator completed, FSU team will lock down nodal after finals
Steering: Loading calculator started, will be complete before Dec 13th, and will lock over-top and middle nodal before w2025