Participants: Titus ChowCalder Kitagawa, Karl DingKevin Chen (Unlicensed)Taiping Li

Overall Goal: The vehicle electrical system should be done by January 2018 so that we can test and improve on the entire system prior to it being installed into the car

Projects

Array (Calder KitagawaJessica LinMinghao Ji)

  • Determine what we want to do and possibly put down a deposit before the end of the term

Battery (Adam MarchandTitus Chow)

  • We expect our cells to arrive by the end of June, so parts for prototyping should be done by then
    • Current deadline of June 24th to have all the copper sheets cut and dimpled, as well as all hardware sourced

BMS (Kevin Chen (Unlicensed), Karl Ding)

  • Hardware
    • AFE board should be done by June 9th for fabrication
  • Software
    • Basic functions should be implemented to protect the test modules by the end of June/early July

Power Distribution (Taiping LiCalder Kitagawa)

  • Hardware
    • The board should be done by June 9th for fabrication
  • Software
    • Software should be done by the end of June

Driver Controls (Fidel Musa (Deactivated)Norman Chong (Unlicensed))

  • Hardware
    • Schematic should be done by end of June
    • PCB should be done by end of term, earlier if possible
  • Software
    • Demo in June
    • Code should be complete by the end of the term, earlier if possible

SWD Adapter (Norman Chong (Unlicensed))

  • Done by June 9th for fabrication

DCDC (TBD)

  • Done by end of Fall 2017

Aux BMS (TBD)

  • Schematic should be done by the end of June

Motor Interface Board (TBD)

  • Decision as to how we're implementing this should be made by the end of June

Lights (TBD)

  • Hardware 
    • Lights should be chosen for the lights by end of June
  • Software 
    • Software should be done by the end of the term

Telemetry (Calder KitagawaKarl Ding)

  • Hardware
    • Eval boards will be used till we have resources on the hardware team
  • Software
    • January 2018

Solar Interface (Titus Chow

  • We should settle on a solution by the end of June


Orders

Elecrow

  • Board order on June 9th for AFE, Power Distribution, SWD Adapter

Digi-key

  • One order on May 29
  • One order once Elecrow ships the boards out

Mouser

  • Dura-clik crimp tool, crimps, ISL retainers, receptacles etc 


  • No labels