Epoxy:
3M adhesive left underneath the cabinet
Make sure the gun matches, push and pull the tabs
Thin line, 2 hour cure time
2 adhesive tubes will do the trick
make sure the gun you’re choosing says “3M structural adhesive” on it
https://www.youtube.com/watch?v=_TmC8I3YBrc
Notes:
Do not epoxy any of the 3D prints;
Day 1:
Bring enclosure frame and panels to the machine shop
Grab 3M structural epoxy from underneath chemical cabinet (20 minute shell life)
Clamping width pieces: should be straight forward because there are holes in the fibre-glass due to vent + fan holders. Orient the box so there is room on the sides to clamp
Clamping length pieces: ~3.5cm from the top of the steel frame to the top of the fibre-glass. Grab the metal clamps from the drawer in the bay and clamp the top. To ensure the bottom is flush grab something heavy and place along the bottom and sides
Wait for epoxy to dry
Cut adhesive gasket by 1/2 to make it 1/4 inch thick, then epoxy to lid, clamp, and let dry for 24 hours (ask Michael if waiting for 24 hours is necessary) before proceeding
Day 2:
Clamping bottom panel: put something heavy (with one object towards the middle that does NOT move) to keep it more steady. Ensure M4 bolts are put through the holes of the enclosure frame and the panels to make sure everything lines up
Measure the distance and ensure the two side-pieces of the lid are at the appropriate length away from the edges
Measure the distance between the edges with calipers and ensure it is the same alongside the entire edge. Mark edge of fiberglass with a pen/marker
Use the middle panel to act as a validation check and ensure there is enough space for it to fit
Apply epoxy, and put something heavy on the edges to weigh the panel down
Finish machining fixtures on the lid of the enclosure for impounding (ask Shem for status on that)
Things to think about:
have a partial 3D printed baffle with length 15mm instead of 5mm to make sure holes align at the right spots for baffle
assemble all 4 side panels first so you can clamp from the bottom BEFORE gluing in the bottom piece and weighing it down with books/something heavy
flip the enclosure upside-down when gluing the side lid panels so gravity can due its work. Q: how to make sure this lines up correctly?
If it takes 24 hours to set the panels - you would have to wait between each step (length, width, etc.)
NEED TO FIND OUT WHERE TO ORIENT CLAMPS - stability
make sure enclosure feet fit to Chassis, test screwing-in bat box to enclosure