 14 September 2023 - Check-in Meeting

Aux Battery

  • Tested 25-ish cells (approx 60 total)

    • Probs finish testing after CAD deadline for 24

  • CAD - need mount (will be late by few)

    • will upload to github EOD

  • Cells may need balancing, will add balancing taps

Deliverable: Finish the CAD for the 24th

Enclosure

  • Design overall → opening mechanism not optimal

  • Will recad with bare min.

    • will host a design sprint with first years (sometime week)

    • optimize for air intake

  • Box will rest on the floor of aero

  • Shem → working on removal tool

  • Manufacturing enclosure will have to wait

    • fireproof resin??

  • top, bottom, holder will print (module)

  • Ports have been found, need to confirm

    • Same as MSXII

  • Wire gauge - ? 2-6 AWG?

    • hw → harnessing tell them (jenna)

    • high current speccing

  • It was determined the module holders will be epoxied to the base of the enclosure

    • Reviewed w. Micheal the manufacturing process/considerations

Deliverable: Tuesday get a new timeline for the enclosure + Design review

Board Mounts

  • Integration meeting happened, got lots of info for mounts

  • AFE almost done, carrier and current sense not

  • Ideal for current sense and carrier to be on top of each other

  • Saturday → sprint for mounts

  • Redesign, two brackets instead of two brackets and top plate

  • AFE and carrier the same size

  • Improve space for wiring, add standoffs for the mount

PVDR

  • Use the MSXVII PVDR as much as possible

  • Review Sunday 17th 7PM

Module Testing????

  • Manufacturing state → as soon as possible

  • Kostubh will draft a testing procedure for the pack to validate

    • Cell testing/validation → completed

    • Manufacturing guideline → test + revise as needed

  • Will be there Monday to discuss

Coulomb Counting

  • Telemetry moved to low-priority task

    • Discussed with integrations and will try to have all state of charge calculations local on the board itself

    • Driver can manually read out the state of charge via radio

  • Looking into different integration methods for calculating SoC on STM32, should have some research by the next integrations meeting on Tuesday

    • Will be compared with IC board that Forest found to see which is more accurate

  • currently doing research on viable algorithms and will be checking in with integrations on tuesday on our next steps based on the research

This week:

Apply for passes (HTN): shem, nicole, maggie, vaihbav

Nicole → rch session for first years

 18 September 2023 - Module Design Review

Summary: Got bodied but tight deadlines before manufacturing can proceed

Module

  • add ribs to the L bracket of the module holder

  • Make into one part

  • Vertical mounts - make sure there is enough space/strong for heat insert

  • Test the module to module connections

  • Shift the hole to eliminate divet in plate

Cell Holder

  • ABS → look into printing services (Micheal, WatIMake)

Busbars

  • Only have sigma clad for module to module connections

    • Nickel to nickel for parallel + series connections

    • Due to spot-welding limitations

  • Conduct resistivity test of connections

Module to Enclosure Design

  • Hex caps MAY interfere with one another

  • M3 may be too weak

  • Find hardware to fit

Module to AFE

  • Highest temp will be in the center

  • Change number of thermistors to 24 → change layout

Manufacturing

  • Test material resistivity

  • No thermal test

  • Need a way to measure ambient temperature (post manufacturing)

    • Strat will need this data

Electrical Connections

  • Figure out a way, low prio, copper bar works for now

 20 September 2023 - Check-in Meeting
  • Chaos

  • New members starting to integrate (assigned to projects on Sat)

 05 November 2023 - Testing

Production Module Testing (4.5.3)

  • keysight: not feasible too long

  • two paralle

possible solutions for worst case:

  • ask other people? not done yet

  • ask profs

  • maybe past documentation

  • ask teerstra

  • ask lab in waterloo

  • talk other design teams

  • ask prof for battery challenge

Current assessment of module manufacturing & testing

  • all modules to be completely manufactured: dec 8th

  • will have to check with testing the first module

  • do we have prototype module testing goals?

    • draw for 30min and check temperature

    • asc does not outline anything specific

Prototype module testing:

  • depends on what we say

    • will say it was first one made (of the production run)

  • documentation needed? no but yes (for future etc)

  • keep prototype deadline same on pvdr but aim for end of nov

  • continue to test for production

Pack & battery systems validation

  • different equipment?

    • either use motor or power resistors

    • have a completed plan before jan 2024 (check-in mid-dec)

Actionables:

  • module manufacturing timeline done for 06-11 (will check with donna)

  • working on on validation plan - check monday 05-11 and review (check with owen)

  • jenna will start prototype testing this week, feasibility test (check-in end of week)

    • just draw current 58.2 A and 3.6V with module