 14 September 2023

Aux Battery

  • Tested 25-ish cells (approx 60 total)

    • Probs finish testing after CAD deadline for 24

  • CAD - need mount (will be late by few)

    • will upload to github EOD

  • Cells may need balancing, will add balancing taps

Deliverable: Finish the CAD for the 24th

Enclosure

  • Design overall → opening mechanism not optimal

  • Will recad with bare min.

    • will host a design sprint with first years (sometime week)

    • optimize for air intake

  • Box will rest on the floor of aero

  • Shem → working on removal tool

  • Manufacturing enclosure will have to wait

    • fireproof resin??

  • top, bottom, holder will print (module)

  • Ports have been found, need to confirm

    • Same as MSXII

  • Wire gauge - ? 2-6 AWG?

    • hw → harnessing tell them (jenna)

    • high current speccing

Deliverable: Tuesday get a new timeline for the enclosure + Design review

Board Mounts

  • Integration meeting happened, got lots of info for mounts

  • AFE almost done, carrier and current sense not

  • Ideal for current sense and carrier to be on top of each other

  • Saturday → sprint for mounts

  • Redesign, two brackets instead of two brackets and top plate

  • AFE and carrier the same size

  • Improve space for wiring, add standoffs for the mount

PVDR

  • Use the MSXVII PVDR as much as possible

  • Review Sunday 17th 7PM

Module Testing????

  • Manufacturing state → as soon as possible

  • Kostubh will draft a testing procedure for the pack to validate

    • Cell testing/validation → completed

    • Manufacturing guideline → test + revise as needed

  • Will be there Monday to discuss

This week:

Apply for passes (HTN): shem, nicole, maggie, vaihbav

Nicole → rch session for first years