Project Validation
...
CAN
...
- Loop back mode Mitchell Langdon Ostler
- External Controller (Peak CAN) Jarvis Weng
- Controller Board to Controller Board Jarvis Weng
...
Status | ||
---|---|---|
|
...
GPIO_IT
...
- General Hardware Verification Preston Glicerio Dresser
...
Status | ||
---|---|---|
|
...
ADC
...
- General Hardware Verification Mitchell Langdon Ostler
...
Status | ||||
---|---|---|---|---|
|
...
I2C
...
- General Hardware Verification Adel Chinoy
...
SPI
...
- General Hardware verification
...
Status | ||||
---|---|---|---|---|
|
Centre Console
Validation Steps
Status
Blockers
PCA
- Verify outputs of IO expander
Project | Status | Blockers | Completion Date | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||
| Final PRs merged, New Hardware in transit | ||||||||||||
| |||||||||||||
| Make a new smoke project for this | ||||||||||||
| Continue validation steps | ||||||||||||
| Need to push in PR | ||||||||||||
| Centre Console |
| Solar |
...
title | Controller Board |
---|
...
Validation Steps
...
Status
...
Blockers
| Need to review to PR | |||
|
|
|
Buttons
- Verify button presses are read in test task
- Test pressing all at once, ensure all events are received
|
|
7-Seg Display
- Check that you can enable/disable output
- Verify all 3 displays operating
Status | ||||
---|---|---|---|---|
|
Full Validation
Power Distribution
Validation Steps
Status
Blockers
Outputs
- Verify Operation of Load switches using bts_load_switch driver Adhiraj Singh
- Verify Operation of Outputs using Output Config Adhiraj Singh
- Verify current readings
- Verify multiplexor with current readings
- Trigger Undervoltage/overvoltage conditions, see if it triggers interrupt (do after everything else in case board explodes)
Status | ||
---|---|---|
|
Output Read verification
- Verify Outputs are successfully read in main loop
Status | ||||
---|---|---|---|---|
|
Need gpio expanders verified
Lights FSM verification
- Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
Status | ||||
---|---|---|---|---|
|
Need all previous verified
Power FSM Verification
- Verify by setting can messages internally
- Verify by sending can messages over PEAK CAN
Status | ||||
---|---|---|---|---|
|
| Some are broken again….. |