Controller Board

...

Project Validation

Project

Status

Blockers

CAN

Completion Date

AFEs

Status

titleIn Progress

GPIO_IT

Status
titleIn Progress

ADC

colourYellow
titlePR Required

Power Distribution

Status
colour

Green

I2C

Status
titleIn Progress

SPI

  •  General Hardware verification

Purple
title

DOne

INTEGRATION

Final PRs merged, New Hardware in transit

MCI

Status
colour

Red

Purple
title

Blocked

Need SPI sensor to test further

Centre Console

Validation Steps

Status

Blockers

PCA

  •  Verify outputs of IO expander

INTEGRATION

Current Sense

Status
colour

Red

Yellow
title

Blocked

Buttons

  •  Verify button presses are read in test task
  •  Test pressing all at once, ensure all events are received

7-Seg Display

  •  Check that you can enable/disable output
  •  Verify all 3 displays operating

Power Distribution

Validation Steps

Status

Blockers

Outputs

  •  I2C write
    •  Verify operation of PCA9555 library (toggle_state, set state, init), make changes for storing values Arvind Sanjay
  •  I2C read (Mitchell Langdon Ostler)
    •  PCA get state
  •  Verify Operation of Load switches using bts_load_switch driver Adhiraj Singh
  •  Verify Operation of Outputs using Output Config Adhiraj Singh
  •  Verify current readings
  •  Verify multiplexor with current readings
  •  Trigger Undervoltage/overvoltage conditions, see if it triggers interrupt (do after everything else in case board explodes)

Status
titleIn Progress

  • Need output config merged for last verification

Output Read verification

  •  Verify Outputs are successfully read in main loop

PR required

Make a new smoke project for this

BMS Carrier

Status
colourBlue
titleIn progress

Continue validation steps

Pedal

Status
colour

Red

Purple
title

Blocked

INTEGRATION

Need

gpio expanders verified

Lights FSM verification

  •  Verify by setting can messages internally
  •  Verify by sending can messages over PEAK CAN

to push in PR

Steering

Status
colour

Red

Purple
title

Blocked

INTEGRATION

Need

all previous verified

Power FSM Verification

  •  Verify by setting can messages internally
  •  Verify by sending can messages over PEAK CAN

to review to PR

Centre Console

Status
colour

Red

Purple
title

Blocked

Need all previous verified

Telemetry

...

Validation Steps

...

Status

...

Blockers

...

HC-12

...

  •  Develop basic tooling and verify connection/data transfer

...

Status
titleIn Progress

...

Getting hardware

...

LoFa

...

  •  Develop basic tooling and verify connection/data transfer

...

UV Cutoff

Validation Steps

Status

Blockers

Load Switch

  •  Check that load switches work, and isense can be read

Preston Glicerio Dresser

Status
titleIn Progress

VBAT_Status

  •  

INTEGRATION

Controller Board

Status
colourRed
titleWorking!!!?