Controller Board
...
Project Validation
Project | Status | Blockers |
---|
CAN
- Loop back mode Mitchell Langdon Ostler
- External Controller (Peak CAN) Jarvis Weng
- Controller Board to Controller Board
Completion Date | ||
---|---|---|
|
|
GPIO_IT
- General Hardware Verification Preston Glicerio Dresser
Status | ||
---|---|---|
|
ADC
- General Hardware Verification Mitchell Langdon Ostler
| ||||||
|
|
I2C
- General Hardware Verification Adel Chinoy
| Final PRs merged, New Hardware in transit | |||||
|
SPI
- General Hardware verification
| ||||
|
Validation Steps
Status
Blockers
Outputs
- Verify Operation of IO expanders using smoke test
- Verify Operation of Load switches using bts_load_switch driver
- Verify Operation of Outputs using Output Config
|
Need SPI sensor to test further
Power Distribution
| Make a new smoke project for this | ||||||
|
Need output config merged for last verification
Fan Controllers
- Develop Smoke Test
- General hardware verification of Fan Controllers
Output Read verification
- Verify Outputs are successfully read in main loop
Lights FSM verification
Power FSM Verification
Telemetry
...
Validation Steps
...
Status
...
Blockers
...
HC-12
...
- Develop basic tooling and verify connection/data transfer
...
Status | ||
---|---|---|
|
...
Need output config merged for last verification
...
LoFa
...
- Develop basic tooling and verify connection/data transfer
...
UV Cutoff
Validation Steps
Status
Blockers
Load Switch
- Check that load switches
Status | ||
---|---|---|
|
Need output config merged for last verification
VBAT_Status
| Continue validation steps | ||||||||
| Need to push in PR | ||||||||
| Need to review to PR | ||||||||
| |||||||||
| Some are broken again….. |