This page will outline the roles and responsibilities + action plan for the Fall '21 term!
Agenda
Determine tasks that need to be completed before next term starts
Determine goals and responsibilities for next term
onsite leads, offsite leads, and onboarding leads
Term Transition Goals
Below is an outline of the tasks that need to be completed before the Fall term starts
...
Details
...
Priority
...
Final designs for board sendoff
Pedal, Precharge, UV Cuttoff?, Solar?
...
Status | ||||
---|---|---|---|---|
|
Complete wiring diagram
...
Status | ||||
---|---|---|---|---|
|
Term Goals
Spring Term:
Assembling Final Versions of Boards
Complete all board mounts
Complete all harnesses
Complete all enclosures
Assemble all items
Note |
---|
No specific dates since COVID might just screw everything up… will use time estimates 😢 |
...
Details
...
Priority
...
Timeline
...
Assembling final versions of boards
PD, Lights, Steering, Solar, UV Cutoff, BMS Carrier
Status | ||||
---|---|---|---|---|
|
...
4 months
...
Explore MPPT Issues
...
Status | ||||
---|---|---|---|---|
|
...
Validation / Testing
Powertrain, MCI
Charger Interface
Elcon Charger to mockup battery
Precharge
BMS
Connect power supply to each channel, verify lower and upper faults
Solar Sense → can test outside (MPPT layout)
Don’t have a load to test motors… Need to put it on the car
...
Status | ||||
---|---|---|---|---|
|
...
Further testing motors depends on mech (need rolling chassis)
BMS → dependent on battery, also need BMS Carrier assembled
...
HV integration into mockup
...
Status | ||||
---|---|---|---|---|
|
...
Telemetry, Headlights and Cameras (w/ Interiors)
...
Status | ||||
---|---|---|---|---|
|
...
Sorry, Renzo
...
Carryover from Fall 2020
...
Carryover from Winter 2021
...
All onsite tasks:
Assembling final versions of boards (HW)
PD
PS (done)
Steering
Lights
Solar
UV Cutoff
Centre Console (done)
Current Sense (done)
Motor Sense Validation (HW)
At the stage of integrating Sense to Controllers
Blocks all of Power Train
High voltage testing (HW)
Integration Testing
Blocked by Motor Sense Validation
Blocked by Pre-Charge integration testing
...
Assemble final versions of most boards (excl. AFE, DCDC, Charger interface, MCI) (January)
HW validation for new versions
Notes:
Aashmika has the reflow at home to assemble most boards
if lockdown happens, this can still be done at Aashmika’s house.
Unit test boards once they return
if designs are flawed, board needs to be resent (at any stage)
Integrate into mockup (February) - must be onsite
Displays
Horn
Cameras
Telemetry Router
Mockup Testing
Solar
BMS Full (Pending Battery pack, and other testing)
MCI, Limit testing for Motors (includes carryover from F2020)
Full Mockup Integration (w/ displays)
Worst case: bleed into Spring
Complete all harnessing/make diagram for full vehicle (near EOT)
Includes layout
Note: this is offsite, if lockdown, will move this task to Jan
Finalize Enclosures Layout
(to plan for post W2021)
...
Spring Term
Assembling Final Versions of Boards
Complete all board mounts
Complete all harnesses
Complete all enclosures
Assemble all items
See full documentation here
Core Team
...
Name (Term)
...
Responsibilities
...
On-Site Capacity
...
Aashmika (Co-op)
...
• Assembly of final versions of boards
• Precharge
...
• Onsite
...
Micah
(Co-op)
...
•Offsite, limited capacity
...
James L
(School)
...
• Assembly of final versions of boards
• Telemetry Diagram
...
• Remote, will in in-person in Fall 2021
• Most likely can’t help
...
Nita
(School)
...
• Assemble PD (reflowed on side, hand-assembled the other side)
• Task force for diagram making
...
• Remote
• Can maybe visit on weekends but will be overloading during the term
...
Liam
(School)
...
• Assembly of final versions of boards
...
• Remote
• has equipment to do assembly / validation without being in loo
...
Kristen
(Co-op)
...
Ricky
(School)
...
Janvi
...
Alastair
...
Lucy
...
Odianosen
Onboarding
...
Knowledge Share
...
Lead
...
Date
...
Week 1 - Electrical Overview
...
...
Week 2 - Board Lifecycle
...
...
Week 3 - Regulations
...
...
Week 4 - Energy Throughout Solar Car
...
Goal for this term
a intro to the electrical sub-systems 2.0
Previous onboarding
a intro to the electrical sub-systems
design a board
how to be useful onsite
Engagement ideas (after members watch videos)
Jump on a call to do worksheets together
Kahoot
Purchases
...
Item(s)
...
Estimate Price
...
Source
...
board sendout (midterm)
...
Status | ||
---|---|---|
|
...
Status | ||
---|---|---|
|
...
Status | ||||
---|---|---|---|---|
|
...
Status | ||||
---|---|---|---|---|
|
...
Status | ||
---|---|---|
|
Tasks for Off-site Members
...
Task
...
Difficulty
...
Notes
...
Power Consumption Evaluation
...
Status | ||||
---|---|---|---|---|
|
...
Wiring Diagram
...
Status | ||||
---|---|---|---|---|
|
...
Component Investigations
...
Status | ||||
---|---|---|---|---|
|
Reviews for all tasks together
Last Saturday of each month? Extended standup 😞
Buddy system (2-3 members w/ a lead)
Leads combine tasks to have groups work on them together (Kristen )
Saturday work sessions
Standups once a week → Wednesdays
Expectations for Next Term
RETAIN MEMBERS 😃
Join On-Site weekly standups to get a better grasp of overall elec progress, improve knowledge
Next Steps
Kristen S to get everyone ready for onsite work (safety plan, etc.)
Term Layout - Remote Tasks
...
Wednesday standup to go over group progress - groups will give updates together
...
Let’s make a functioning electrical system that our team has confidence in
Hardware Board Tracker: https://docs.google.com/spreadsheets/d/1jHOwbDABYXWmmHzvjW53ptATln2FnBwLFK0n42lHUNg/edit#gid=1169282152
Revisiting W21 goals…
Assembling final versions of boards
Motor Sense Validation (Hall-effect issues) - Weekend :)
High voltage testing
Cell balancing + BMS Testing - in progress
Validation for final versions of boards (FW & HW)
Harnessing Planning ??
Fall 2021 Goals
Task | Notes | Timeframe |
---|---|---|
Integrate new hardware changes |
| |
CanExplorer |
| October Demo |
MU |
| |
Bootloader |
| EOT |
Board Sendout |
| 2nd Week of September |
Wiring Diagram |
| October |
BMS / BPS Testing |
| |
Charger Interface Testing |
| |
Pick and Place Machine |
|
Other:
Those familiar with vehicle architecture (apart from leads): Jess, Mitchell, Jarvis
No in-person onboarding component this term
Who will be onsite next term apart from Mitchell and Jess?
more CAN adapters…? Talk to Jess to see if there’s more equipment. the team may need/want?
Solar enclosure may be moved under the rear enclosure
Concerns:
MPPT issues - not consistent
Harnessing is blocked by mech in general
Boards (Onsite Progress)
Fully test Charger Interface
Testing AFEs and BMS to make sure we have thermistor readings
MPPTs don’t consistently boost, need to do more testing to see what’s wrong
Solar - Relay driver wasn’t working properly, need to replace the IC + conduct ideal diode tests
Debug Power Selection
Lights - have to test with higher driving currents if we need to make the lights brighter
Details | Current Status | Priority | Timeframe | ||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
BMS Carrier
|
|
| |||||||||||||||||||||||||||||||
Front/Rear Power
|
| ||||||||||||||||||||||||||||||||
Power Selection
|
| ||||||||||||||||||||||||||||||||
Steering
|
| ||||||||||||||||||||||||||||||||
Solar
|
| ||||||||||||||||||||||||||||||||
Charger Interface
|
|
| |||||||||||||||||||||||||||||||
AFEs
|
| ||||||||||||||||||||||||||||||||
Battery Connector Module
|
| ||||||||||||||||||||||||||||||||
Center Console
|
|