Overall Goal: The vehicle electrical system should be done by January 2018 so that we can test and improve on the entire system prior to it being installed into the car

Projects

Array (Calder KitagawaJessica LinMinghao Ji)

...

  • Hardware
    • AFE board should be done by June 9th for fabrication
    • Carrier board should be done end of June
  • Software
    • Basic functions should be implemented to protect the test modules by the end of June/early July

...

Driver Controls (Fidel Musa (Deactivated)Norman Chong (Unlicensed))

  • Hardware
    • Schematic All schematics should be done by end of June (button board + carrier board)
    • Carrier board PCB should be done by end of term, earlier if possibleJune
  • Software
    • Demo in June
    • Code should be complete by the end of the term, earlier if possibleJune/early July (by boards come in)

SWD Adapter (Norman Chong (Unlicensed))

...

  • Done by end of Fall 2017

Aux BMS (Timea Ratiu (TBDUnlicensed))

  • Schematic Block diagram should be done by the end of June
  • PCB done by end of term

Motor Interface Board (TBD)

...

Fidel Musa (Deactivated))

  • Hardware
    • Looking into using STM32F0 as co-processor on carrier board
    • Board done by end of year
    • Prototype with two controller boards
  • Software
    • Proof of concept by end of term

Lights (TBD)

  • Hardware 
    • Lights should be chosen for the lights by end of June
  • Software 
    • Software should be done by the end of the term

Telemetry (Calder KitagawaKarl Ding)

...

Solar Interface (Titus Chow

...

  • Hardware
    • Probably using I2C slave boards


Orders

Elecrow

  • Board order on June 9th for AFE, Power Distribution, SWD Adapter, Controller Board rev4
  • Board order July 7 for BMS carrier, Driver Controls (carrier board only, no button board) 

Digi-key

  • One order on May 29
  • One order once Elecrow ships the boards out

...

  • Dura-clik crimp tool, crimps, ISL retainers, receptacles etc etc

Follow-up  

Array

  • Slightly behind schedule, but we should still have our preliminary layout done by the end of August

Battery

  • Behind schedule, cells have arrived, but we still need parts from mechanical to prototype

BMS

  • Hardware
    • Rev 1 is working, but we need to re-spin for some minor changes
  • Software
    • ADC driver is mostly done, the actual application code is fairly straight forward other than SOC, and it can be done next term

Power Distribution 

  • Hardware
    • Rev 1 was mostly functional, Rev 2 has been ordered and planned to be populated by the end of Aug
  • Software
    • Software should also be mostly done by the end of August

Driver Controls

  • Hardware
    • Rev 1 of Driver Controls Carrier and Peripheral were sent out, and should be tested by the end of the term
  • Software
    • Good progress has been made. Some changes have to be done, but should be good for testing. 

SWD Adapter

  • Hardware is finished and fully functional

DCDC (TBD)

  • Still scheduled to be done by Fall 2017

Aux BMS

  • Behind schedule, but should be done by end of Fall 2017

Motor Interface Board

  • Hardware
    • Hardware should be complete by the end of the term
  • Software
    • TBD, but it should be done by Nov 2017

Lights

  • Hardware
    • Lights have been mostly chosen, should be done by end of Fall 2017
  • Software
    • Done by end of next term

Telemetry

  • Hardware
    • Eval boards for now
  • Software
    • Jan 2018 is still a good deadline

Solar Interface

  • Hardware
    • We need 2 solar masters, and each will control maybe 2 relays